Welcome to flywing-tech.com
Fly-Wing electronic components distributor Online Store
English
VS-20ETF12SPBF image
Favorite
VS-20ETF12SPBF image
Favorite
RoHS
RoHS RoHS compliant
Package TO-263-3, D2Pak (2 Leads + Tab), TO-263AB
Category Discrete Semiconductor Products / Diodes - Rectifiers - Single
Description Diode Switching 1.2KV 20A 3-Pin(2+Tab) D2PAK Tube
PDF
/
Inventory: 5705
Minimum: /
The more specific your information, the faster response you will get.
Please complete the following form with the details of your request part and contact information to get a quote.
Quotation Consultation
Is there anything else we can help you solve?
Inquiry

Technical Details

Compliance

RoHS Status ROHS3 Compliant
Radiation Hardening No

Technical

Recovery Time 400 ns
Reverse Voltage 1.2kV
Peak Non-Repetitive Surge Current 355A
Max Repetitive Reverse Voltage (Vrrm) 1.2kV
Peak Reverse Current 100μA
Reverse Recovery Time 400 ns
Number of Phases 1
Average Rectified Current 20A
Max Reverse Voltage (DC) 1.2kV
Forward Voltage 1.31V
Voltage - DC Reverse (Vr) (Max) 1200V
Application FAST SOFT RECOVERY
Max Surge Current 355A
Operating Temperature - Junction -40°C~150°C
Forward Current 20A
Case Connection CATHODE
Voltage - Forward (Vf) (Max) @ If 1.31V @ 20A
Current - Reverse Leakage @ Vr 100μA @ 1200V
Diode Type Standard
Speed Fast Recovery =< 500ns, > 200mA (Io)
Element Configuration Single
Number of Elements 1
JESD-30 Code R-PSSO-G2
Base Part Number 20ETF12
Time@Peak Reflow Temperature-Max (s) 10
Peak Reflow Temperature (Cel) 260
Terminal Form GULL WING
HTS Code 8541.10.00.80
Additional Feature FREE WHEELING DIODE
Min Operating Temperature -40°C
Max Operating Temperature 150°C
Terminal Finish MATTE TIN OVER NICKEL
ECCN Code EAR99
Number of Terminations 2
Moisture Sensitivity Level (MSL) 1 (Unlimited)
Part Status Discontinued
Pbfree Code yes
JESD-609 Code e3
Published 2012
Packaging Tube

Physical

Diode Element Material SILICON
Number of Pins 3
Package / Case TO-263-3, D2Pak (2 Leads + Tab), TO-263AB
Mounting Type Surface Mount
Mount Surface Mount

Supply Chain

Factory Lead Time 10 Weeks

VS-20ETF12SPBF+price,VS-20ETF12SPBF+datasheet,VS-20ETF12SPBF+in stock,buy+VS-20ETF12SPBF,finder+VS-20ETF12SPBF,VS-20ETF12SPBF+tutorials,VS-20ETF12SPBF+download