Welcome to flywing-tech.com
Fly-Wing electronic components distributor Online Store
English
IRF540ZLPBF image
Favorite
IRF540ZLPBF image
Favorite
RoHS
RoHS RoHS compliant
Package TO-262-3 Long Leads, I2Pak, TO-262AA
Category Discrete Semiconductor Products / Transistors - FETs, MOSFETs - Single
Description MOSFET N-CH 100V 36A TO-262
PDF
/
Buying Options
Total Price: USD $1.36
Unit Price: USD $1.3552
≥1 USD $1.3552
≥10 USD $1.090496
≥100 USD $0.86416
Inventory: 127
Minimum: 1
-
+

Technical Details

Compliance

Lead Free Lead Free
RoHS Status ROHS3 Compliant
REACH SVHC No SVHC
Radiation Hardening No

Dimensions

Width 4.826mm
Length 10.668mm
Height 9.65mm

Technical

Nominal Vgs 4 V
Drain to Source Breakdown Voltage 100V
Gate to Source Voltage (Vgs) 20V
Continuous Drain Current (ID) 36A
Turn-Off Delay Time 43 ns
Fall Time (Typ) 39 ns
Vgs (Max) ±20V
Drive Voltage (Max Rds On,Min Rds On) 10V
Rise Time 51 ns
Gate Charge (Qg) (Max) @ Vgs 63nC @ 10V
Current - Continuous Drain (Id) @ 25°C 36A Tc
Input Capacitance (Ciss) (Max) @ Vds 1770pF @ 25V
Vgs(th) (Max) @ Id 4V @ 250μA
Rds On (Max) @ Id, Vgs 26.5m Ω @ 22A, 10V
Transistor Application SWITCHING
FET Type N-Channel
Turn On Delay Time 15 ns
Case Connection DRAIN
Power Dissipation 92W
Operating Mode ENHANCEMENT MODE
Element Configuration Single
Power Dissipation-Max 92W Tc
Number of Elements 1
Time@Peak Reflow Temperature-Max (s) 30
Current Rating 36A
Peak Reflow Temperature (Cel) 260
Technology MOSFET (Metal Oxide)
Voltage - Rated DC 100V
Subcategory FET General Purpose Power
Additional Feature AVALANCHE RATED, HIGH RELIABILITY, ULTRA-LOW RESISTANCE
Terminal Finish Matte Tin (Sn) - with Nickel (Ni) barrier
Resistance 26.5MOhm
ECCN Code EAR99
Number of Terminations 3
Moisture Sensitivity Level (MSL) 1 (Unlimited)
Part Status Active
JESD-609 Code e3
Series HEXFET?
Published 2010
Packaging Tube
Operating Temperature -55°C~175°C TJ

Physical

Transistor Element Material SILICON
Number of Pins 3
Package / Case TO-262-3 Long Leads, I2Pak, TO-262AA
Mounting Type Through Hole
Mount Through Hole

Supply Chain

Factory Lead Time 12 Weeks

IRF540ZLPBF+price,IRF540ZLPBF+datasheet,IRF540ZLPBF+in stock,buy+IRF540ZLPBF,finder+IRF540ZLPBF,IRF540ZLPBF+tutorials,IRF540ZLPBF+download