Welcome to flywing-tech.com
Fly-Wing electronic components distributor Online Store
English
VS-10ETF04SPBF image
Favorite
VS-10ETF04SPBF image
Favorite
RoHS
RoHS RoHS compliant
Package TO-263-3, D2Pak (2 Leads + Tab), TO-263AB
Category Discrete Semiconductor Products / Diodes - Rectifiers - Single
Description Diode Switching 400V 10A 3-Pin(2+Tab) D2PAK Tube
PDF
/
Buying Options
Total Price: USD $15.27
Unit Price: USD $15.27315
≥1 USD $15.27315
≥10 USD $12.53145
≥100 USD $12.14005
≥500 USD $11.74865
≥1000 USD $11.35725
Inventory: 9107
Minimum: 1
-
+

Technical Details

Compliance

RoHS Status ROHS3 Compliant
Radiation Hardening No

Dimensions

Width 9.65mm
Length 10.67mm
Height 4.83mm

Technical

Recovery Time 145 ns
Max Forward Surge Current (Ifsm) 160A
Reverse Voltage 400V
Peak Non-Repetitive Surge Current 160A
Max Repetitive Reverse Voltage (Vrrm) 400V
Peak Reverse Current 100μA
Reverse Recovery Time 145 ns
Number of Phases 1
Average Rectified Current 10A
Max Reverse Voltage (DC) 400V
Forward Voltage 1.2V
Application FAST SOFT RECOVERY HIGH POWER
Max Surge Current 160A
Operating Temperature - Junction -40°C~150°C
Forward Current 10A
Case Connection CATHODE
Voltage - Forward (Vf) (Max) @ If 1.2V @ 10A
Current - Reverse Leakage @ Vr 100μA @ 200V
Diode Type Standard
Speed Fast Recovery =< 500ns, > 200mA (Io)
Element Configuration Common Anode
Number of Elements 1
JESD-30 Code R-PSSO-G2
Pin Count 3
Time@Peak Reflow Temperature-Max (s) 10
Peak Reflow Temperature (Cel) 260
Terminal Form GULL WING
Terminal Position SINGLE
Subcategory Rectifier Diodes
HTS Code 8541.10.00.80
Additional Feature FREE WHEELING DIODE
Min Operating Temperature -40°C
Max Operating Temperature 150°C
ECCN Code EAR99
Number of Terminations 2
Moisture Sensitivity Level (MSL) 1 (Unlimited)
Part Status Discontinued
Pbfree Code yes
JESD-609 Code e3
Published 2013
Packaging Tube

Physical

Diode Element Material SILICON
Number of Pins 3
Package / Case TO-263-3, D2Pak (2 Leads + Tab), TO-263AB
Mounting Type Surface Mount
Mount Surface Mount
Contact Plating Tin

Supply Chain

Factory Lead Time 10 Weeks

VS-10ETF04SPBF+price,VS-10ETF04SPBF+datasheet,VS-10ETF04SPBF+in stock,buy+VS-10ETF04SPBF,finder+VS-10ETF04SPBF,VS-10ETF04SPBF+tutorials,VS-10ETF04SPBF+download