Welcome to flywing-tech.com
Fly-Wing electronic components distributor Online Store
English
TPS2211APWP image
Favorite
TPS2211APWP image
Favorite

TPS2211APWP

Texas Instruments
RoHS
RoHS RoHS compliant
Package 20-PowerTSSOP (0.173, 4.40mm Width)
Category Integrated Circuits (ICs) / PMIC - Power Distribution Switches, Load Drivers
Description Tube TPS2211 Current Limiting (Fixed) Over Temperature e4 power distribution switch 6.5mm 13.5V 1A 2.74W
PDF
/
Buying Options
Total Price: USD $1.57
Unit Price: USD $1.57415
≥1 USD $1.57415
≥100 USD $1.292
≥250 USD $1.2521
≥1000 USD $1.21125
Inventory: 6445
Minimum: 1
-
+

Technical Details

Compliance

Radiation Hardening No
RoHS Status ROHS3 Compliant
Lead Free Lead Free

Dimensions

Thickness 1mm
Width 4.4mm
Length 6.5mm
Height 1.2mm

Technical

Rds On (Typ) 70m Ω
Fault Protection Current Limiting (Fixed), Over Temperature
Voltage - Load 3.3V 5V 12V
Ratio - Input:Output 3:2
Nominal Input Voltage 13.5V
Switch Type PCMCIA Switch
Adjustable Threshold NO
Voltage - Supply (Vcc/Vdd) Not Required
Power Dissipation 2.74W
Output Configuration High Side
Nominal Supply Current 50μA
Number of Ports 1
Current - Output (Max) 1A
Analog IC - Other Type POWER SUPPLY SUPPORT CIRCUIT
Interface Parallel
Number of Channels 3
Number of Outputs 2
Pin Count 20
Base Part Number TPS2211
Terminal Pitch 0.65mm
Supply Voltage 3.3V
Number of Functions 1
Peak Reflow Temperature (Cel) 260
Terminal Form GULL WING
Terminal Position DUAL
Technology BICMOS
Subcategory Power Management Circuits
Additional Feature ALSO OPERATE ON 5V SUPPLY
Terminal Finish Nickel/Palladium/Gold (Ni/Pd/Au)
Resistance 70mOhm
ECCN Code EAR99
Number of Terminations 20
Moisture Sensitivity Level (MSL) 2 (1 Year)
Part Status Active
Pbfree Code yes
Feature Status Flag
JESD-609 Code e4
Packaging Tube
Operating Temperature -40°C~85°C TA

Physical

Weight 81.788374mg
Number of Pins 20
Package / Case 20-PowerTSSOP (0.173, 4.40mm Width)
Mounting Type Surface Mount
Mount Surface Mount

Supply Chain

Lifecycle Status ACTIVE (Last Updated: 2 days ago)
Factory Lead Time 6 Weeks

TPS2211APWP+price,TPS2211APWP+datasheet,TPS2211APWP+in stock,buy+TPS2211APWP,finder+TPS2211APWP,TPS2211APWP+tutorials,TPS2211APWP+download