Welcome to flywing-tech.com
Fly-Wing electronic components distributor Online Store
English
DRV8870EVM image
Favorite
DRV8870EVM image
Favorite

DRV8870EVM

Texas Instruments
RoHS
/
Package Module
Category Development Boards, Kits, Programmers / Evaluation and Demonstration Boards and Kits
Description EVALUATION MODULE DRV8870
PDF
/
Buying Options
Total Price: USD $51.74
Unit Price: USD $51.744
≥1 USD $51.744
Inventory: 54
Minimum: 1
-
+

Technical Details

Supply Chain

Factory Lead Time 4 Weeks
Lifecycle Status ACTIVE (Last Updated: 2 days ago)

Physical

Package / Case Module
Number of Pins 0

Technical

Part Status Active
Moisture Sensitivity Level (MSL) 1 (Unlimited)
Type Power Management
Function Motor Controller/Driver
Utilized IC / Part DRV8870
Supplied Contents Board(s)
Evaluation Kit Yes
Primary Attributes Single-H-Bridge Driver
Secondary Attributes Potentiometer Speed Control

Compliance

REACH SVHC No SVHC
RoHS Status Non-RoHS Compliant

DRV8870EVM+price,DRV8870EVM+datasheet,DRV8870EVM+in stock,buy+DRV8870EVM,finder+DRV8870EVM,DRV8870EVM+tutorials,DRV8870EVM+download