Welcome to flywing-tech.com
Fly-Wing electronic components distributor Online Store
English
CD0603-S0180 image
Favorite
CD0603-S0180 image
Favorite

CD0603-S0180

Bourns Inc.
RoHS
RoHS RoHS compliant
Package 0603 (1608 Metric)
Category Discrete Semiconductor Products / Diodes - Rectifiers - Single
Description Diode Small Signal Switching 90V 0.1A 2-Pin Case 0603 T/R
PDF
/
Buying Options
Total Price: USD $0.38
Unit Price: USD $0.3762
≥1 USD $0.3762
≥10 USD $0.30875
≥100 USD $0.29925
≥500 USD $0.28975
≥1000 USD $0.28025
Inventory: 122729
Minimum: 1
-
+

Technical Details

Compliance

RoHS Status ROHS3 Compliant
REACH SVHC No SVHC

Dimensions

Width 1mm
Length 1.8mm
Height 850μm

Technical

Recovery Time 4 ns
Max Forward Surge Current (Ifsm) 1A
Peak Non-Repetitive Surge Current 1A
Capacitance @ Vr, F 4pF @ 1V 100MHz
Max Repetitive Reverse Voltage (Vrrm) 90V
Peak Reverse Current 100nA
Reverse Recovery Time 4 ns
Average Rectified Current 100mA
Max Reverse Voltage (DC) 80V
Forward Voltage 1V
Max Surge Current 1A
Operating Temperature - Junction -40°C~125°C
Max Reverse Leakage Current 100nA
Forward Current 100mA
Voltage - Forward (Vf) (Max) @ If 1V @ 100mA
Current - Reverse Leakage @ Vr 100nA @ 80V
Diode Type Standard
Speed Small Signal =< 200mA (Io), Any Speed
Element Configuration Single
Power Dissipation-Max 0.15W
Number of Elements 1
Case Code (Imperial) 0603
Case Code (Metric) 1608
Qualification Status Not Qualified
Pin Count 2
Base Part Number CD0603
Time@Peak Reflow Temperature-Max (s) NOT SPECIFIED
Peak Reflow Temperature (Cel) NOT SPECIFIED
Terminal Form NO LEAD
Terminal Position DUAL
Subcategory Rectifier Diodes
HTS Code 8541.10.00.70
Min Operating Temperature -40°C
Max Operating Temperature 125°C
ECCN Code EAR99
Number of Terminations 2
Moisture Sensitivity Level (MSL) 1 (Unlimited)
Part Status Obsolete
Pbfree Code yes
Published 2009
Packaging Tape & Reel (TR)

Physical

Diode Element Material SILICON
Number of Pins 2
Package / Case 0603 (1608 Metric)
Mounting Type Surface Mount
Mount Surface Mount
Contact Plating Gold

Supply Chain

Factory Lead Time 12 Weeks

CD0603-S0180+price,CD0603-S0180+datasheet,CD0603-S0180+in stock,buy+CD0603-S0180,finder+CD0603-S0180,CD0603-S0180+tutorials,CD0603-S0180+download