Welcome to flywing-tech.com
Fly-Wing electronic components distributor Online Store
English
UGB10GCT-E3/81 image
Favorite
UGB10GCT-E3/81 image
Favorite
RoHS
RoHS RoHS compliant
Package TO-263-3, D2Pak (2 Leads + Tab), TO-263AB
Category Discrete Semiconductor Products / Diodes - Rectifiers - Arrays
Description DIODE ARRAY GP 400V 5A TO263AB
PDF
/
Inventory: 2283
Minimum: /
The more specific your information, the faster response you will get.
Please complete the following form with the details of your request part and contact information to get a quote.
Quotation Consultation
Is there anything else we can help you solve?
Inquiry

Technical Details

Compliance

RoHS Status ROHS3 Compliant
Radiation Hardening No

Technical

Recovery Time 50 ns
Diode Configuration 1 Pair Common Cathode
Reverse Voltage 400V
Peak Non-Repetitive Surge Current 60A
Max Repetitive Reverse Voltage (Vrrm) 400V
Peak Reverse Current 10μA
Reverse Recovery Time 50 ns
Number of Phases 1
Average Rectified Current 5A
Max Reverse Voltage (DC) 400V
Application EFFICIENCY
Output Current-Max 5A
Max Surge Current 150A
Operating Temperature - Junction -40°C~150°C
Max Reverse Leakage Current 800μA
Forward Current 10A
Voltage - Forward (Vf) (Max) @ If 1.3V @ 5A
Current - Reverse Leakage @ Vr 10μA @ 400V
Diode Type Standard
Speed Fast Recovery =< 500ns, > 200mA (Io)
Element Configuration Common Cathode
Number of Elements 2
JESD-30 Code R-PSSO-G2
Pin Count 3
Base Part Number UGB10GCT
Time@Peak Reflow Temperature-Max (s) 30
Peak Reflow Temperature (Cel) 245
Terminal Form GULL WING
Terminal Position SINGLE
Subcategory Rectifier Diodes
HTS Code 8541.10.00.80
Additional Feature FREE WHEELING DIODE
Min Operating Temperature -40°C
Max Operating Temperature 150°C
Terminal Finish Tin (Sn) - with Nickel (Ni) barrier
ECCN Code EAR99
Number of Terminations 2
Moisture Sensitivity Level (MSL) 1 (Unlimited)
Part Status Active
Pbfree Code yes
JESD-609 Code e3
Published 2011
Packaging Tape & Reel (TR)

Physical

Diode Element Material SILICON
Number of Pins 3
Package / Case TO-263-3, D2Pak (2 Leads + Tab), TO-263AB
Mounting Type Surface Mount
Mount Surface Mount

Supply Chain

Factory Lead Time 20 Weeks

Recommended For You

UGB10GCT-E3/81+price,UGB10GCT-E3/81+datasheet,UGB10GCT-E3/81+in stock,buy+UGB10GCT-E3/81,finder+UGB10GCT-E3/81,UGB10GCT-E3/81+tutorials,UGB10GCT-E3/81+download