Welcome to flywing-tech.com
Fly-Wing electronic components distributor Online Store
English
SBR10200CTB image
Favorite
SBR10200CTB image
Favorite

SBR10200CTB

Diodes Incorporated
RoHS
RoHS RoHS compliant
Package TO-263-3, D2Pak (2 Leads + Tab), TO-263AB
Category Discrete Semiconductor Products / Diodes - Rectifiers - Arrays
Description Diode Switching 200V 10A 3-Pin(2+Tab) D2PAK Tube
PDF
/
Buying Options
Total Price: USD $5.41
Unit Price: USD $5.4055
≥1 USD $5.4055
≥10 USD $4.43555
≥100 USD $4.29685
≥500 USD $4.15815
≥1000 USD $4.0204
Inventory: 6957
Minimum: 1
-
+

Technical Details

Compliance

RoHS Status ROHS3 Compliant
REACH SVHC No SVHC
Radiation Hardening No

Technical

Natural Thermal Resistance 2 °C/W
Max Forward Surge Current (Ifsm) 80A
Diode Configuration 1 Pair Common Cathode
Peak Non-Repetitive Surge Current 80A
Max Repetitive Reverse Voltage (Vrrm) 200V
Peak Reverse Current 10mA
Reverse Recovery Time 20 ns
Number of Phases 1
Average Rectified Current 5A
Max Reverse Voltage (DC) 200V
Forward Voltage 920mV
Application FAST SOFT RECOVERY
Output Current-Max 10A
Operating Temperature - Junction -65°C~175°C
Forward Current 5A
Voltage - Forward (Vf) (Max) @ If 920mV @ 5A
Current - Reverse Leakage @ Vr 5μA @ 200V
Diode Type Super Barrier
Speed Fast Recovery =< 500ns, > 200mA (Io)
Element Configuration Common Cathode
Number of Elements 1
JESD-30 Code R-PSSO-G2
Pin Count 4
Base Part Number SBR10200CT
Time@Peak Reflow Temperature-Max (s) 40
Peak Reflow Temperature (Cel) 260
Terminal Form GULL WING
Terminal Position SINGLE
Subcategory Rectifier Diodes
HTS Code 8541.10.00.80
Min Operating Temperature -65°C
Max Operating Temperature 175°C
Terminal Finish Matte Tin (Sn)
ECCN Code EAR99
Number of Terminations 2
Moisture Sensitivity Level (MSL) 1 (Unlimited)
Part Status Active
Pbfree Code no
JESD-609 Code e3
Series SBR?
Published 2010
Packaging Tube

Physical

Diode Element Material SILICON
Number of Pins 3
Package / Case TO-263-3, D2Pak (2 Leads + Tab), TO-263AB
Mounting Type Surface Mount
Mount Surface Mount

Supply Chain

Factory Lead Time 14 Weeks

Recommended For You

SBR10200CTB+price,SBR10200CTB+datasheet,SBR10200CTB+in stock,buy+SBR10200CTB,finder+SBR10200CTB,SBR10200CTB+tutorials,SBR10200CTB+download