Welcome to flywing-tech.com
Fly-Wing electronic components distributor Online Store
English
CY7B993V-2AXCT image
Favorite
CY7B993V-2AXCT image
Favorite
RoHS
RoHS RoHS compliant
Package 100-LQFP
Category Integrated Circuits (ICs) / Clock/Timing - Clock Generators, PLLs, Frequency Synthesizers
Description LVPECL LVTTL Clock Buffer Fanout Distribution 100-LQFP CY7B993 clock generator circuit 3.63V 100MHz 250mA 0.5mm
PDF
/
Inventory: 6829
Minimum: /
The more specific your information, the faster response you will get.
Please complete the following form with the details of your request part and contact information to get a quote.
Quotation Consultation
Is there anything else we can help you solve?
Inquiry

Technical Details

Compliance

Lead Free Lead Free
RoHS Status ROHS3 Compliant

Technical

Same Edge Skew-Max (tskwd) 0.5 ns
Divider/Multiplier Yes/Yes
Propagation Delay (tpd) 0.25 ns
Prop. Delay@Nom-Sup 0.25 ns
Differential - Input:Output No/No
PLL Yes
Max I(ol) 0.002 A
Ratio - Input:Output 4:18
Input LVPECL, LVTTL
Family 7B
Frequency (Max) 100MHz
Nominal Supply Current 250mA
Number of Circuits 1
Supply Voltage-Min (Vsup) 2.97V
Supply Voltage-Max (Vsup) 3.63V
Operating Supply Voltage 3.3V
Qualification Status Not Qualified
Number of Outputs 18
Pin Count 100
Output LVTTL
Base Part Number CY7B993
Time@Peak Reflow Temperature-Max (s) 30
Terminal Pitch 0.5mm
Supply Voltage 3.3V
Number of Functions 1
Peak Reflow Temperature (Cel) 260
Terminal Form GULL WING
Terminal Position QUAD
Voltage - Supply 2.97V~3.63V
Subcategory Clock Drivers
Additional Feature CONFIGURABLE AS SINGLE ENDED TTL ALSO
Terminal Finish Nickel/Palladium/Gold (Ni/Pd/Au)
Type Clock Buffer, Fanout Distribution
ECCN Code EAR99
Number of Terminations 100
Moisture Sensitivity Level (MSL) 3 (168 Hours)
Part Status Obsolete
Pbfree Code yes
JESD-609 Code e4
Series RoboClock?
Published 2003
Packaging Tape & Reel (TR)
Operating Temperature 0°C~70°C

Physical

Number of Pins 100
Surface Mount YES
Package / Case 100-LQFP
Mounting Type Surface Mount
Contact Plating Gold, Tin

Supply Chain

Factory Lead Time 10 Weeks

CY7B993V-2AXCT+price,CY7B993V-2AXCT+datasheet,CY7B993V-2AXCT+in stock,buy+CY7B993V-2AXCT,finder+CY7B993V-2AXCT,CY7B993V-2AXCT+tutorials,CY7B993V-2AXCT+download